Doors, Windows & Facades
Aluminum Window Fabrication
Prepare pre-cut aluminum profiles for small batches of window frames. The layout puts the miter saw between two roller stands, then moves parts through end milling, drilling, corner crimping and bench inspection.
- Platform
- 40GP
- Indicative build time
- 8–12 weeks

Inside the module
- Material and WIP rack
- Roller support stand
- Miter saw
- Roller support stand
- End milling machine
- Drill press
- Corner crimping press
- Assembly bench
- Inspection fixture kit
- Material and WIP rack
The illustrated core cell assumes pre-cut profiles up to 2.4 m. Long-stock feeding, chip extraction, glazing and final installation need separate provision.
Equipment at a glance
| In the layout | Qty |
|---|---|
| Material and WIP rack | 2 |
| Roller support stand | 2 |
| Miter saw | 1 |
| End milling machine | 1 |
| Drill press | 1 |
| Corner crimping press | 1 |
| Assembly bench | 1 |
| Inspection fixture kit | 1 |
Supporting scope
- Chip extraction and guarding package
- Window tooling and corner fixtures
Plan this installation.
8–12 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.