Cardboard Baling
Sort and compact dry cardboard near the point of collection. A short bench, vertical baler and floor scale prepare manageable bales for separate staging.
- Platform
- 20GP
- Indicative build time
- 8–13 weeks

Inside the module
- Sorting bench
- Vertical cardboard baler
- Platform scale
- Strapping kit
- Inspection kit
Accept dry cardboard. Set aside space for bulk intake and finished bales, and confirm loading and collection routes.
Equipment at a glance
| In the layout | Qty |
|---|---|
| Sorting bench | 1 |
| Vertical cardboard baler | 1 |
| Platform scale | 1 |
| Strapping kit | 1 |
| Inspection kit | 1 |
Supporting scope
- Bale strapping and handling kit
- External covered bale staging
Plan this installation.
8–13 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.