← All solutions
Site Utility Modules

Compressed Air Service Station

Group compression, drying, air storage and distribution in one service module. The layout keeps the manifold accessible at the service end.

Platform
20GP
Indicative build time
8–12 weeks
20GP GPFORGE Compressed Air Service Station module at a night worksite
night worksiteAI concept illustration

Inside the module

Equipment layoutAI concept illustration
  1. Air compressor
  2. Air dryer
  3. Air receiver
  4. Distribution manifold
  5. Service measurement kit

Size the equipment to site flow and pressure. Confirm ventilation, condensate handling and receiver inspection with the selected package supplier.

Equipment at a glance

In the layoutQty
Air compressor1
Air dryer1
Air receiver1
Distribution manifold1
Service measurement kit1

Supporting scope

  • Ventilation and condensate handling
  • Service isolation and hose connection kit

Plan this installation.

8–12 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.

Prepare an enquiry