Testing & Electronics Labs
Electronics Rework & Repair
Diagnose circuit boards, perform bench rework and inspect the repair under a microscope before functional testing. Use the same compact cell for low-volume service work.
- Platform
- 20GP
- Indicative build time
- 7–11 weeks

Inside the module
- Component rack
- ESD workbench
- Solder rework station
- Local fume extractor
- Inspection microscope
- Electrical test equipment
Confirm grounding, fume capture and test isolation. Use this layout for bench electronics and small assemblies.
Equipment at a glance
| In the layout | Qty |
|---|---|
| Component rack | 1 |
| ESD workbench | 1 |
| Solder rework station | 1 |
| Local fume extractor | 1 |
| Inspection microscope | 1 |
| Electrical test equipment | 1 |
Supporting scope
- ESD grounding and storage kit
- Rework consumables and local fume service
Plan this installation.
7–11 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.
