Agriculture & Food
Produce Sorting & Packing
Sort and pack field produce close to harvest. A wash table, low-speed sorting conveyor and weighing point create a simple receiving-to-packing sequence for small growers.
- Platform
- 40GP
- Indicative build time
- 9–14 weeks

Inside the module
- Receiving crate rack
- Wash table
- Sorting conveyor
- Bench scale
- Inspection kit
- Packed crate rack
Confirm the commodity and wash method. Dirty receiving, wash water and drainage, hygiene separation and packed-product staging need site space.
Equipment at a glance
| In the layout | Qty |
|---|---|
| Receiving crate rack | 2 |
| Wash table | 1 |
| Sorting conveyor | 1 |
| Bench scale | 1 |
| Inspection kit | 1 |
Supporting scope
- Wash-water and drainage package
- Washable staging crates and hygiene separation
Plan this installation.
9–14 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.
