Pipes & Plumbing
PVC Plumbing Spool Kits
Cut and deburr pre-staged PVC pipe, hold short spools in joining stands and check completed joints before dispatch to installation crews.
- Platform
- 20GP
- Indicative build time
- 7–10 weeks

Inside the module
- PVC pipe cutter
- Deburring station
- Pipe joining stand
- Leak test kit
- Inspection gauge kit
Long pipes, ventilated joining provisions, test water and waste containment need a separately agreed site arrangement.
Equipment at a glance
| In the layout | Qty |
|---|---|
| PVC pipe cutter | 1 |
| Deburring station | 1 |
| Pipe joining stand | 1 |
| Leak test kit | 1 |
| Inspection gauge kit | 1 |
Supporting scope
- External long-stock support
- Test water containment kit
Plan this installation.
7–10 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.
