← All solutions
Pipes & Plumbing

PVC Plumbing Spool Kits

Cut and deburr pre-staged PVC pipe, hold short spools in joining stands and check completed joints before dispatch to installation crews.

Platform
20GP
Indicative build time
7–10 weeks
20GP GPFORGE PVC Plumbing Spool Kits module at a infrastructure site
infrastructure siteAI concept illustration

Inside the module

Equipment layoutAI concept illustration
  1. PVC pipe cutter
  2. Deburring station
  3. Pipe joining stand
  4. Leak test kit
  5. Inspection gauge kit

Long pipes, ventilated joining provisions, test water and waste containment need a separately agreed site arrangement.

Equipment at a glance

In the layoutQty
PVC pipe cutter1
Deburring station1
Pipe joining stand1
Leak test kit1
Inspection gauge kit1

Supporting scope

  • External long-stock support
  • Test water containment kit

Plan this installation.

7–10 weeks indicative build window. Indicative build time after drawing approval and confirmation of key equipment availability. Freight, local approvals and site installation are scheduled separately.

Prepare an enquiry